Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13675232

- Product Categories
- Friendly Links
- home > Supply > Gas membrane structures | warehouse air film membrane building locked "German film structure"
Information Name: | Gas membrane structures | warehouse air film membrane building locked "German film structure" |
Published: | 2015-04-29 |
Validity: | 360 |
Specifications: | PVC |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | Gas membrane structures | warehouse air film membrane building locked "German film structure" and Germany has more than 100 customers to solve cesspool stamped, servo technologies lead the industry! Fabrication and installation of membrane structure membrane structure first quarter production technology requirements and conditions of a structure of the film making should be conducted in specialized factories, should have clean, dry, avoid direct sunlight conditions, the film should have special equipment and special production shop, indoor temperature remains within the range of 5-30 ℃, should avoid heat heat radiation on membranes. Second, the membrane structure should have the professional production line process, the necessary cutting, heat sealing equipment and test equipment. And should have been identified or professional assessment of membrane structure design software cut. Third, the production of membrane structure used in test equipment, tools, measuring according to relevant state regulations, metered accreditation, measuring tools should be calibrated once. Fourth, the membrane structure processing operations must have the professional training of appointment cards, appointment cards should clarify its positions and skill requirements. Fifth, the membrane structure cut into film production, connections, accessories production and processing, packaging, transportation. Production shall comply with the following process: determining membrane acceptance, technical parameters, cutting the film, cutting diaphragm geometry test, the diaphragm is connected, the connection strength test, the geometry of the membrane test, the connector positioning Cleanup fixed, the membrane, the film body packaging, marking. Sixth, the membrane structure of the production process design documents should be prepared, which shall include: membrane test, test equipment and measuring tools, cutting the diaphragm is determined, cutting method, the pre-adjustment Tensile amount of production quality standards, process and acceptance methods, packaging and transport. www.zdmjg.com |
Admin>>>
You are the 6215 visitor
Copyright © GuangDong ICP No. 10089450, Shenzhen Sino-German film structure Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6215 visitor
Copyright © GuangDong ICP No. 10089450, Shenzhen Sino-German film structure Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility